Banner image

Under assessment

Environment plans listed on this page are being assessed in accordance with the Environment Regulations, NOPSEMA’s Assessment policy and Decision making guidelines.

To receive updates about environment plans under assessment click ‘subscribe’ button.

For details about a specific activity undergoing assessment including a location map, contact details for the titleholder and a copy of the environment plan, click the ‘view’ button.

(the table below is scrollable as you are on a mobile device)

Activity type Activity name Submitted by Submission date Resubmission date Status
Other survey Stairway-1 Vessel Based Activity Santos Offshore Pty Ltd 09-07-2021 Under assessment (with NOPSEMA) View
Drilling Balnaves Plug and Abandonment Woodside Energy Julimar Pty Ltd 05-07-2021 Under assessment (with NOPSEMA) View
Drilling Enfield Plug and Abandonment Woodside Energy Ltd 21-06-2021 Under assessment (with titleholder) View
Construction and installation of a facility Van Gogh Phase 2 Drilling and Completions Extension Santos WA PVG Pty Ltd 03-06-2021 Under assessment (with titleholder) View
Drilling Bedout Multi-Well Drilling Santos WA Northwest Pty Ltd 07-04-2021 11-06-2021 Under assessment (with titleholder) View
Any other petroleum-related activity West Tryal Rocks 2 Well Abandonment Chevron Australia Pty Ltd 25-03-2021 Under assessment (with titleholder) View
Any other petroleum-related activity Non-production Well Operations (White Ibis-1, Trefoil-1 and Yolla-1) Beach Energy (Operations) Limited 27-02-2021 Under assessment (with titleholder) View
Seismic survey Prion 3D Marine Seismic Survey Beach Energy (Operations) Limited 08-01-2021 22-02-2021 Under assessment (with titleholder) View