Banner image

Project - Barossa Area Development

Description of project

The Barossa Area Development is located in Australian Commonwealth waters within the Bonaparte Basin, approximately 300 kilometres (km) north of Darwin, Northern Territory (NT).

The development concept includes a permanently moored FPSO facility, subsea production system, supporting in-field subsea infrastructure in the Barossa Field (petroleum retention lease NT/RL5) and a subsea gas export pipeline. The FPSO facility will separate the natural gas and condensate extracted from the field with the condensate exported directly from the FPSO facility to offtake tankers in the Barossa offshore development area and the dry gas transported via a subsea gas export pipeline for onshore processing.

While appropriate commercial arrangements are yet to be put in place, it is proposed to connect the new subsea gas export pipeline to the existing Bayu-Undan to Darwin gas export pipeline which feeds the onshore Darwin Liquefied Natural Gas (LNG) facility at Wickham Point, NT. This would allow transport of dry gas from the Barossa Field to Darwin for liquefaction and export. Gas from the Barossa Field would replace the existing supply from the Bayu-Undan Field following its anticipated depletion in 2022.

As the new gas export pipeline route is still subject to refinement, a corridor has been identified for the purposes of the early stage Offshore Project Proposal (OPP) to allow flexibility for placement pending further engineering and environmental investigations.

Potential future staged development in the smaller Caldita Field to the south in retention lease NT/RL6 has also been allowed for in the development concept.

The development is anticipated to produce natural gas and light condensate. The expected LNG and condensate production rates are approximately 3.7 million tonnes per annum and 1.5 million barrels per year, respectively. The life of the project is expected to be approximately 25 years from first gas, which is targeted for 2023.


Company: ConocoPhillips Australia Exploration
Title(s) NT/L1

Contact
Name Mr Brenton Chatfield
Position Senior Environmental Specialist
Telephone +61 8 63632666
Email brenton.s.chatfield@conocophillips.com
Project Map (click to enlarge)
Project map - Barossa Area Development (refer to Description)

Documents
Accepted OPP A598153 (21.7 MB)
Appendices A598152 (89.9 MB)

Activities for this project

Organisation Activity Type Activity name Status
Santos NA Barossa Pty Ltd Construction and installation of a pipeline Barossa Gas Export Pipeline Installation Started
Santos NA Barossa Pty Ltd Drilling Barossa Development Drilling and Completions Started
Santos NA Barossa Pty Ltd Construction and installation of a facility Barossa Subsea Infrastructure Installation Project Started

Back