Activity - Barossa Gas Export Pipeline Installation
Activity - Barossa Gas Export Pipeline Installation
Activity details
Organisation | Santos NA Barossa Pty Ltd |
---|---|
Project | Barossa Area Development |
Activity types | Construction and installation of a pipeline |
In-force EP | 4937 |
Submission date | 02 August, 2019 |
Outcome | Accepted |
Acceptance date | 09 March, 2020 |
Locations |
Northern Territory
|
Start date | 07 November, 2021 |
Stop date | 31 July, 2024 |
Lifecycle Classification | Development |
Titleholder contact
Activity Description |
---|
ConocoPhillips Australia Barossa Pty Ltd and its Joint Venture Partners SK E&S Australia Pty Ltd and Santos Offshore Pty Ltd propose to develop the Barossa Gas Field, which is located in Commonwealth Waters approximately 300 km north-west of Darwin. The development includes bringing gas and condensate from subsea wells to a Floating Production Storage and Offloading (FPSO) facility via a network of subsea flowlines and risers. Initial processing would occur on the FPSO to separate the gas, water and condensate. The condensate would be transferred from the FPSO to specialised tankers for export. The resulting dry gas would be sent to Darwin via a new ~260 km pipeline connected to the existing Bayu-Darwin pipeline. The Barossa project is fully described in the Barossa Area Development Offshore Project Proposal, which was accepted by NOPSEMA in March 2018. This Barossa Gas Export Pipeline Installation Environment Plan is the first of a number of Environment Plans that will be developed under the Barossa Offshore Project Proposal. This Environment Plan specifically addresses installation of the gas export pipeline, which runs north-south from the Barossa gas field to the proposed tie-in location on the existing Bayu-Undan pipeline (~100 km west-north-west of Darwin). Installation activities include: • pre and post lay surveys; • pre and post lay span rectification; • installation of the gas export pipeline and end terminals; and • pipeline pre-conditioning activities. The exact installation schedule has not been finalised, however installation activities are expected to occur between quarter 4, 2020 and quarter 1, 2024. The total infield duration of the offshore installation activities is expected to be approximately nine months. The installation schedule is indicative only with exact timing and duration subject to a number of factors such as vessel availability, weather and sea state. ConocoPhillips will maintain contact with relevant stakeholders to ensure they are informed of installation timelines as the schedule is confirmed. |
Back