Activity - Wheatstone Project - Start-Up and Operations

Activity details
Organisation Chevron Australia Pty Ltd
Project Wheatstone
Activity types Operation of a facility for the recovery or processing of petroleum
Operation of a petroleum pipeline
In-force EP 5709
Submission date 17 August, 2021
Outcome Accepted
Acceptance date 01 August, 2022
Locations North West
Start date 20 June, 2017
Stop date Pending titleholder notification
Lifecycle Classification Operation & Production
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Asten Roopra
Phone: +61 8 9216 4000

Activity Description
The Wheatstone Liquefied Natural Gas (LNG) Project (the Project) produces hydrocarbon fluids from offshore fields, transports these fluids through flowlines to the Wheatstone platform (the platform) for initial processing, and then transports gas and condensate through the trunkline to the onshore gas plant for further processing. Resultant LNG and condensate are exported by vessels to the international market, and gas is available to the domestic market via a tie-in with the existing Dampier to Bunbury Natural Gas Pipeline.

The activities detailed in this EP will be conducted in Commonwealth Waters, Western Australia (WA) State Waters, and on the WA mainland, thus spanning more than one regulatory jurisdiction. Only those activities that fall within a given jurisdiction are submitted to the respective regulator to meet relevant regulations, as follows:

• the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) for acceptance under the Commonwealth Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 (OPGGS(E)R)
• the WA Department of Mines, Industry Regulation and Safety (DMIRS) for approval under the Petroleum (Submerged Lands) (Environment) Regulations (PSLER) 2012 (WA), and the Petroleum Pipelines (Environment) Regulations (PPER) 2012 (WA).

Location
Fluid production will be from wells located in the Wheatstone (WA-46-L, WA-47-L, and WA-48-L) and Iago (WA-46-L and WA-48-L) fields located off the Pilbara coast of WA. Additionally, the platform (WA-3-IL) will receive fluids from the Julimar Development Project (JDP) WA-49-L, located south west of WA-48-L, described in the Woodside Energy Julimar Pty Ltd (Woodside) EP.

The offshore section of the trunkline includes a Commonwealth Waters section from the platform to the State Waters boundary (WA-25-PL), and a State Waters section (TPL/25) to the shore crossing through a microtunnel. The trunkline exits the microtunnel and remains buried onshore for approximately 1 km before emerging above ground just before the onshore endpoint located upstream of the gas plant. The trunkline crosses the shore at Ashburton North, which is approximately 12 km south-west of Onslow on the Pilbara Coast, within the Shire of Ashburton, W.A.

Scope
This EP addresses Project Start-up and Operations activities associated with the Wheatstone and Iago hydrocarbon system and platform, which comprises the Wheatstone and Iago field wells and associated subsea infrastructure, the platform, and the trunkline from platform to the onshore end point.
Location map (click to enlarge)
Location map - Activity: Wheatstone Project - Start-Up and Operations (refer to description)

Accepted EP Documents

EP Document A853704 (34.5 MB)
OPEP Document A798394 (2.47 MB)
OSMP Document A798393 (9.99 MB)