Project - Greater Enfield Project (Australia Oil)
Project - Greater Enfield Project (Australia Oil)
Description of project
The Ngujima-Yin Floating, Production, Storage and Offloading (FPSO) facility is located over the Vincent oil field. Woodside have been producing from the Vincent field, located 50 km offshore Exmouth, Western Australia, since 2008.
Approved in 2016, the project will develop the Laverda Canyon, Norton over Laverda (WA-59-L) and Cimatti (WA-28-L) oil accumulations. These reserves will be produced via a 31 km subsea tie-back to the Ngujima-Yin Floating, Production, Storage and Offloading (FPSO) facility.
Contact
Name | Mr Daniel Cleary |
---|---|
Position | . |
Telephone | +61893484000 |
feedback@woodside.com.au |
Activities for this project
Organisation | Activity Type | Activity name | Status |
---|---|---|---|
Woodside Energy Ltd | Operation of a facility for the recovery or processing of petroleum | Ngujima-Yin FPSO Operations | Stopped |
Woodside Energy Ltd | Any other petroleum-related activity | Nganhurra Operations Cessation | Stopped |
Woodside Energy Ltd | Drilling | Enfield Plug and Abandonment | Stopped |
Woodside Energy Ltd | Decommissioning, dismantling or removing a facility | Enfield Subsea Infrastructure Decommissioning (WA-28-L) | Stopped |
Back