Banner image

Project - Mutineer-Exeter

Description of project

Production from the Mutineer Exeter oil fields began in 2005, serviced by the Floating Production Storage and Offtake (FPSO) facility, Modec Venture 11 (MV-11), approximately 100km from Dampier. In 2013, the Fletcher and Finucane oil fields were tied back to the MV-11. Production ceased in 2018, with all wells shut-in and MV-11 permanently leaving the location in July of that year. The subsea infrastructure will remain in place ‘preserved’ during a ‘cessation of production’ phase that will continue until field decommissioning prior to final field decommissioning.


Company: Santos Limited

Contact
Name Mr Brian Siddall
Position Joint Venture Manager
Telephone +61 8 93339557
Email Brian.Siddall@santos.com
Project Map (click to enlarge)
Project map - Mutineer-Exeter (refer to Description)

Documents

Activities for this project

Organisation Activity Type Activity name Status
Santos Limited Decommissioning, dismantling or removing a facility Mutineer Exeter Cessation of Production and Decommissioning Stopped

Back