Gippsland Basin Decommissioning - Campaign #1 Execution Environment Plan

Activity type Decommissioning, dismantling or removing a facility
Activity subtypes
Lifecycle Classification Decommissioning
Submitted by Esso Australia Resources Pty Ltd
Submission date 17 April, 2025
Subtype New
Decision date
RMS ID 8306
Status Under assessment (with NOPSEMA)
Link to previously accepted EP
Contact
Hena Kalam
Phone: (03) 9261 0000
Location map (click to enlarge)
Location map - Activity: Gippsland Basin Decommissioning - Campaign #1 Execution Environment Plan (refer to description)
Description

Esso is planning to undertake the first decommissioning campaign for the Bass Strait facilities (Campaign #1), which are located in Commonwealth waters, between 21 and 77 kilometres off the east coast of Victoria.
Campaign #1 includes the removal of the topsides of up to 13 offshore platforms, the removal of the upper jacket sections of up to 10 steel piled jacket facilities and the full removal to seabed of two monotowers. Removal of the facilities will be completed by a heavy lift vessel - the Allseas Pioneering Spirit, supported by one or more construction support vessels. The heavy lift vessel or construction support vessel will transport the removed topsides and jacket sections to a sheltered location closer to shore where it will be transferred onto a barge or a heavy transport vessel (HTV) for onward transit. Other smaller vessels, tugs and helicopters will provide support during the removal activities.
The activities under this EP are expected to commence in the third quarter of 2026 and conclude during the first quarter of 2028. The Pioneering Spirit HLV is expected to undertake removal activities for approximately 4 months, commencing in the third quarter of 2027.

Other Details
Locations Gippsland
Commonwealth waters adjacent to VIC
Titles (or other instruments) VIC/L02
VIC/L05
VIC/L07
VIC/L11
VIC/L13
VIC/L14
VIC/L15
VIC/L17
Current Documents (Under assessment)
EP Document


OPEP Document


Location map