Angel Facility Operations

Activity type Operation of a facility for the recovery or processing of petroleum
Activity subtypes Operation of a petroleum pipeline
Lifecycle Classification Operation & Production
Submitted by Woodside Energy Ltd
Submission date 29 August, 2023
Subtype Revision
Decision date 25 June, 2024
RMS ID 7548
Status Finalised
Outcome Accepted
Link to previously accepted EP 6759 - Angel Facility Operations
Contact
Andrew Winter
Phone: 08 9348 4000
Location map (click to enlarge)
Location map - Activity: Angel Facility Operations (refer to description)
Description

Woodside is submitting a revision of the North West Shelf (NWS) Project’s Angel Operations Environment Plan in accordance with the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 (Cth). The Angel platform is located in Commonwealth waters about 125 km north-west of Karratha in Western Australia and has been operating since 2008. The facility consists of subsea hydrocarbon gathering systems, a riser platform and an export pipeline. This Environment Plan is being revised and resubmitted to integrate drilling, subsea installation, commissioning (drilling and tie-back) and production from the Lambert West reservoir (Lambert West tie-back) into the existing Angel production systems. The following activities are proposed to occur within Production Licences WA-16-L and WA-3-L and Pipeline Licences WA-31-PL and WA-14-PL:
• routine production and associated activities
• routine inspection, monitoring, maintenance and repair (IMMR) of the platform and associated subsea infrastructure
• well clean up and commissioning
• drill new well in the Lambert West field
• subsea infrastructure installation
• pre-commissioning and commissioning activities.
The Angel facility will operate 24 hours a day for the 5-year duration of this EP. The Lambert West drilling and tie-back activities are planned to occur in 2024, with contingency to occur in 2025.
Angel is an offshore not normally manned (NNM) production platform that produces dry gas and condensate. Gas and condensate is processed on the Angel platform then transported via an export pipeline to the North Rankin Complex, and then onshore to the Karratha Gas Plant (KGP) for processing. The Angel platform is marked on nautical maps surrounded by a 500 m exclusion zone to shipping.

Other Details
Locations North West
Commonwealth waters adjacent to Western Australia
Titles (or other instruments) WA-3-L
WA-16-L
WA-14-PL
WA-31-PL
Current Documents (Finalised)
EP Document


Location map


Previous EP Documents (Under assessment)
EP Document


Location map