Banner image

Blackback Plugging and Abandonment

Activity type Any other petroleum-related activity
Activity subtypes
Lifecycle Classification Decommissioning
Submitted by Esso Australia Resources Pty Ltd
Submission date 27 August, 2018
Subtype New
Decision date 20 November, 2018
RMS ID 4603
Status Finalised
Outcome Accepted
Link to previously accepted EP
Contact

Ms Carolyn Thomas
Offshore Risk, Environment and Regulatory Supervisor
Esso Australia Resources Pty Ltd
Level 9, 664 Collins Street
DOCKLANDS  VIC  3008
+61 3 9261 0260
carolyn.y.thomas@exxonmobil.com

Location map (click to enlarge)
Location map - Activity: Blackback Plugging and Abandonment  (refer to description)
Description


The Blackback P&A Environment Plan covers the permanent plugging and abandonment (P&A) of the Blackback A-1A, Blackback A-2 and Blackback A-3 wells. The Blackback subsea facility is located approximately 90 km from shore at approximately 400m water depth in Production Area VIC/L20. The Blackback P&A campaign will utilise the Ocean Monarch MODU, which is already in Bass Strait, to P&A the three Blackback subsea wells. The three wells will be permanently abandoned by installation of cement plugs as barriers, followed by the retrieval of wellheads from the seafloor. This campaign will eliminate loss of containment risks associated with live hydrocarbon wells and will remove obstructions and snag points for commercial fishermen. The campaign is an ALARP action in its own right and should be considered in this context. P&A activities in the Blackback operational area are scheduled over an estimated 71 day period commencing in Q4 2018.

Other Details
Locations Gippsland
Commonwealth waters adjacent to VIC
Titles (or other instruments) VIC/L20