Banner image

Montara Production Drilling

Activity type Drilling
Activity subtypes
Lifecycle Classification Operation & Production
Submitted by PTTEP Australasia (Ashmore Cartier) Pty Ltd
Submission date 05 May, 2017
Subtype Revision
Decision date 24 August, 2017
RMS ID 4017
Status Finalised
Outcome Accepted
Link to previously accepted EP 2262 - Montara Production Drilling
Contact

Ryan Hartfield
Chief Executive Officer
PTTEP Australasia (Ashmore Cartier) Pty Ltd
Level 5, 225 St Georges Terrace
Perth, Western Australia 6000
(08) 9483 9484
ryanh@pttep.com

Location map (click to enlarge)
Location map - Activity: Montara Production Drilling (refer to description)
Description


The Montara Development Project (MDP) is located in Commonwealth waters within Production Licences AC/L7 and AC/L8 in the Timor Sea, between Australia and the island of Timor approximately 690 km (373 nm) east of Darwin in a water depth of approximately 77m (LAT) (refer to Figure 4.1). The MDP includes developing the Montara, Swift, Skua and Swallow fields and operating the developed facilities for commercial production of the oil reserves. Oil is extracted from production wells in each of the fields and transported in flow lines to the Montara Venture Floating Production, Storage and Offloading (FPSO) facility, via the Montara Well Head Platform. 
 
The Montara Production Drilling Activity involves the sidetrack, drill and completion of one horizontal production well (Montara H5 ST-2) at the Montara Wellhead Platform with a planned duration of approximately 60 days and are scheduled to commence in September 2017. Timings are subject to weather and operational efficiency and so the proposed timetable is therefore September 2017 to February 2018.

Other Details
Locations Ashmore Cartier, Northern Territory
Commonwealth waters adjacent to ACI , Northern Territory
Titles (or other instruments) AC/L7
Current Documents (Finalised)
EP Document


Decision notifications




Location map