Banner image

North Rankin Complex Operations

Activity type Operation of a facility for the recovery or processing of petroleum
Activity subtypes Operation of a petroleum pipeline
Any other petroleum-related activity
Lifecycle Classification Operation & Production
Submitted by Woodside Energy Ltd
Submission date 23 May, 2014
Subtype Revision
Decision date 05 August, 2014
RMS ID 2757
Status Finalised
Outcome Accepted
Link to previously accepted EP
Contact

Stephen Munday
Corporate Affairs Adviser
North West Shelf
Woodside Energy Ltd
11 Mount Street
PERTH WA 6000
T: +61 8 9348 4000
E: stephen.munday@woodside.com.au
Please direct email enquiries to our website;
http://www.woodside.com.au/Investors-Media/resources/Pages/Contact-Us.aspx
Toll free: 1800 442 977

Location map (click to enlarge)
Location map - Activity: North Rankin Complex Operations (refer to description)
Description


Woodside Energy Ltd (Woodside) is operator of the North Rankin Complex (NRC), which is located offshore in Production Licence WA-1-L approximately 135 km North of Dampier and 23 km North East of the Goodwyn Alpha (GWA) facility, Western Australia.  The NRC is a single integrated facility which is comprised of two platforms, the North Rankin A (NRA) and the North Rankin B (NRB) platform. The two platforms are now fully integrated and operating as one complex, with low pressure operations from the NRC first commencing in December 2013. The facility stands in approximately 125 m of water.
Gas and condensate is transported to the Karratha Gas Plant via a trunkline system for processing. Approximately 105 km of the trunkline length is located in Commonwealth waters and included in the scope of the NRC EP; the remaining lengths are located in State waters and are the subject of a separate EP.
Normal operations at NRC fall under the following modes of operation:

Production and maintenance;


Production and well maintenance;


Subsea IMR activities;


Production and major projects; and


Remote operations.

Additional operational activities in relation to the EP include:

 Operational and emergency flaring of excess gas through independent NRA and NRB flare systems;


 Processing and discharge of drainage, cooling and brine water; and


 Processing and discharge of Produced Formation Water (PFW) within discharge limits.

The proposed Persephone Development (a separate activity) comprises a two well subsea tieback to the NRC and remains subject to a final investment decision by the North West Shelf Project. When implemented, this development will include a flowline running from the subsea wells located at the Persephone field approximately 6.9 km to the North East of NRC. NRC modifications associated with the Persephone Development, required prior to first gas, are included within the NRC EP
Note: This information has been extracted from the EP Summary. Please refer to the attached EP Summary for more information.
 

Other Details
Locations North West, Pilbara
Commonwealth waters adjacent to Western Australia
Titles (or other instruments) TPL/15
TPL/16
WA-1-L
WA-1-PL
Current Documents (Finalised)
EP Document


Location map