Julimar Phase 2 Drilling and Subsea Installation

Activity type Drilling
Submitted by Woodside Energy Julimar Pty Ltd
Submission date 30 May, 2019
Submission type New
Decision date
RMS ID 4869
Status Under assessment (with NOPSEMA)
Link to previously accepted EP
Contact
Daniel Cleary
Phone: +61893484000
Location map (click to enlarge)
Location map - Activity: Julimar Phase 2 Drilling and Subsea Installation (refer to description)
Description

Woodside Energy Julimar Pty Ltd (Woodside), proposes to undertake the following activities for the Julimar Development Phase 2:
• Drill and develop four production wells, connected to a six-slot manifold (‘JULA’).
• Construct an approximately 22 km production flowline and control umbilical extension between the JULA manifold and the existing Brunello Crossover Manifold (BRU-XOM).
• Install and pre-commission subsea hardware and flowline.
The Petroleum Activities Program will be carried out using a moored semi-submersible MODU, pipelay vessel, installation vessels and a variety of support vessels, and is anticipated to commence in Q4 2019 and be completed in 2022. The proposed activities are located within Production Licence WA-49-L, approximately 185 km offshore from Dampier on the north west coast of Western Australia, with the closest landfall being the Montebello Islands, approximately 48km to the south.

Other Details
Locations North West
Commonwealth waters adjacent to Western Australia
Titles (or other instruments) WA-49-L
Current Documents (Under assessment)
EP Document


OPEP Document


Location map


Appendices