Banner image

Activity - Julimar Phase 2 Drilling and Subsea Installation

Activity details
Organisation Woodside Energy Julimar Pty Ltd
Project Julimar Development
Activity types Drilling
In-force EP 4869
Submission date 30 May, 2019
Outcome Accepted
Acceptance date 08 November, 2019
Locations North West
Start date 21 October, 2021
Stop date 04 December, 2021
Lifecycle Classification Development
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Daniel Clery
Phone: +61893484000

Activity Description
Woodside Energy Julimar Pty Ltd (Woodside), proposes to undertake the following activities for the Julimar Development Phase 2:
• Drill and develop four production wells, connected to a six-slot manifold (‘JULA’).
• Construct an approximately 22 km production flowline and control umbilical extension between the JULA manifold and the existing Brunello Crossover Manifold (BRU-XOM).
• Install and pre-commission subsea hardware and flowline.
The Petroleum Activities Program will be carried out using a moored semi-submersible MODU, pipelay vessel, installation vessels and a variety of support vessels, and is anticipated to commence in Q4 2019 and be completed in 2022. The proposed activities are located within Production Licence WA-49-L, approximately 185 km offshore from Dampier on the north west coast of Western Australia, with the closest landfall being the Montebello Islands, approximately 48km to the south.
Location map (click to enlarge)
Location map - Activity: Julimar Phase 2 Drilling and Subsea Installation (refer to description)

Accepted EP Documents

EP Document A700198 (17.9 MB)
OPEP Document A676662 (4.63 MB)
Appendices A706072 (1.57 MB)

Related EP assessments

4869 (Click to view)

Back