Banner image

Activity - Wandoo Facility

Activity details
Organisation Vermilion Oil & Gas Australia Pty Ltd
Project Wandoo
Activity types Operation of a facility for the recovery or processing of petroleum
Any other petroleum-related activity
In-force EP 5378
Submission date 10 September, 2020
Outcome Accepted
Acceptance date 19 May, 2021
Locations North West
Start date Pending titleholder notification
Stop date Pending titleholder notification
Lifecycle Classification Operation & Production
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Namek Jivan
Phone: +61 8 9215 0304

Activity Description
Vermilion Oil & Gas Australia Pty Ltd (VOGA) is the licensed permit holder of production licence area WA-14L, which contains the Wandoo Production Facility. The Permit Area is located in Commonwealth waters in the Carnarvon Basin off the northwest coast of Western Australia, approximately 80 km northwest of Dampier and 110 km northeast of Barrow Island in water depths of approximately 54 m.

The Wandoo Field was discovered in 1991. Extraction of crude oil commenced in 1993 from a single unmanned monopod wellhead platform (Wandoo A) supporting a helideck and five production wells. In 1997, the Wandoo B production platform was installed and connected to Wandoo A by a subsea production pipeline.

The Wandoo B production platform is supported on four concrete shafts that are attached to a Concrete Gravity Structure (CGS) that is comprised of ballast, product storage and water cells. The CGS sits on the seabed.

The oil produced from Wandoo A is piped to the Wandoo B production platform. Oil is stored and then offloaded through flexible pipelines to a Catenary Anchor Leg Mooring (CALM) Buoy located 1.2 km north of the Wandoo B platform. A floating hose is used to transfer the oil from the CALM Buoy to export tankers moored to the CALM Buoy. Export tankers are chartered to offload the oil approximately every three to five weeks, depending on production rates and market requirements. Duration of export activity is typically 24-48 hours depending on the export cargo size and transfer rate.

VOGA has been operating in the Permit Area since 2005.