Banner image

Activity - Pluto 4D Monitor 3 Marine Seismic Survey

Activity details
Organisation Woodside Burrup Pty Ltd
Project
Activity types Seismic survey
In-force EP 8686
Submission date 27 January, 2026
Outcome Accepted
Acceptance date 20 August, 2026
Locations North West
Start date Pending titleholder notification
Stop date Pending titleholder notification
Lifecycle Classification Exploration
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Nicolas Wirtz
Phone: 08 9348 4000

Activity Description
Woodside Burrup Pty. Ltd. proposes to undertake a third monitor (M3) 4D marine seismic survey as part of a
reservoir management and surveillance program of the Pluto gas field which straddles the WA-34-L and WA-49-L permits. The survey will acquire time lapse data that will be used to review subtle changes of fluid movement and gas pressure saturation in the gas reservoir, caused by hydrocarbons being depleted through production. To obtain these time lapse images, the seismic survey will follow as accurately as possible the sail lines acquired by previous monitor surveys (Pluto 4D Baseline and Monitor 1 in 2016 and Pluto Monitor 2 in 2020).
The Petroleum Activity will take place in Commonwealth waters within the North Carnarvon Basin, Exmouth Plateau, about 28 km north-west of the Montebello Islands and 150 km north-west of Dampier and is expected to take approximately 40 days from late December 2026 to February 2027. The sound source will not be discharged during December to avoid the pygmy blue whales’ peak southern migration. In the event the Petroleum Activity does not occur during the target period, a contingency for the same period in the subsequent year (i.e. late December 2027 to February 2028) in included.
Activities proposed to be undertaken are as follows:
• 4D seismic data acquisition using a seismic survey vessel towing an acoustic source array and receiver cables (streamers).
• support operations from a support vessel and chase vessel.
Location map (click to enlarge)
Location map - Activity: Pluto 4D Monitor 3 Marine Seismic Survey (refer to description)

Accepted EP Documents

EP Document REGOPS-841858483-347734 (52.5 MB)
NOPSEMA Report REGOPS-841858483-348621 (205 KB)

Related EP assessments

8686 (Click to view)

Back