Activity - ECSP: Installation and Wells Connection

Activity details
Organisation Cooper Energy (CH) Pty. Ltd.
Project East Coast Supply Project
Activity types Construction and installation of a pipeline
Any other petroleum-related activity
In-force EP 8657
Submission date 02 January, 2026
Outcome Accepted
Acceptance date 24 June, 2026
Locations Otway
Start date Pending titleholder notification
Stop date Pending titleholder notification
Lifecycle Classification Development
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Nathan Childs
Phone: 08 8100 4900

Activity Description
Cooper Energy (CH) Pty Ltd proposes to undertake subsea installation of flowlines and umbilical control systems, and the tie-in of 3 wells from the Annie-2, Juliet and Nestor gas fields to the existing Casino Henry Netherby (CHN) field infrastructure within Commonwealth waters of the Otway Basin. Cooper Energy (CH) Pty Ltd is a subsidiary company of the parent company Cooper Energy which was rebranded as Amplitude Energy in November 2024. The well connection and installation activities will be undertaken in Cooper Energy’s existing permits VIC/L24, VIC/L37, VIC/P76 offshore from Peterborough in water depths of 56m to 65m. Amplitude Energy requires a pipeline licence variation (VIC/PL37) for the well tiebacks to be approved prior to commencing the installation activities.

The proposed scope of the installation and well connection activities covered by this Environment Plan (EP) consists of the following activities:
• Survey, inspection, maintenance and repair activities.
• Umbilical system laying (includes SUDU/UTAs and flying leads).
• Flowline system laying.
• Installation of subsea structures.
• Post-lay works (as-builts and stabilisation if required).
• Testing & preservation.

Planned activities will occur within an operational area defined a 3 km corridor centred over each of the connecting flowlines from the well to connection with the CHN pipeline. The operational area a 500 m radius (0.8 km²) long-term petroleum safety zone around the suspended development wells.
The operational area is north of primary shipping routes with some Commonwealth and State fishery overlap, and adjacent to the Southern Ocean offshore wind zone. During installation activities, the installation vessel and other support vessels may be visible from the coastline, similar to other shipping traffic. All equipment installed during the campaign will be on the seabed and will not be visible above the sea surface.

Activities will be conducted on a 24 hour, 7 days per week basis with the activity proposed to commence as early as Q1 2027. The installation campaign is expected to take up to 120 days, in event all wells are connected in a single campaign excluding environmental and operational delays. Pipeline integrity monitoring will be undertaken annually following completion of installation activities until commissioning of the wells.

The development wells and connecting flowlines to existing CHN facilities will remain suspended until commissioning currently proposed in Q2 2028. The future production from the well will be subject to future regulatory approvals and licencing and is not within the scope of this EP. This EP identifies and evaluates credible environmental impacts and risks associated with the Activity and ongoing management of the pre commissioned flowlines.
Location map (click to enlarge)
Location map - Activity: ECSP: Installation and Wells Connection (refer to description)

Accepted EP Documents

EP Document A1352739 (21.2 MB)
OPEP Document A1300608 (6 MB)
OSMP Document A1300602 (1.76 MB)
Appendices A1337922 (46.9 MB)

Related EP assessments

8657 (Click to view)

Back