Banner image

Activity - Reindeer Wellhead Platform and Offshore Gas Supply Pipeline Operations

Activity details
Organisation Santos WA Northwest Pty Ltd
Project Reindeer Field Development
Activity types Operation of a facility
Operation of a petroleum pipeline
In-force EP 4917
Submission date 16 July, 2019
Outcome Accepted
Acceptance date 09 July, 2020
Locations North West


Titleholder contact
Gareth Bamford
Phone: 62187100

Activity Description
The 'Santos WA Northwest Pty Ltd - Reindeer Wellhead Platform and Offshore Gas Supply Pipeline Operations' EP is a 5-year revision and comprises all activities that are associated with the operation of the Reindeer wellhead platform (WHP) and associated wells within permit area WA-41-L and the offshore section of the Devil Creek Gas Supply Pipeline (DC supply pipeline; WA-18-PL) in Commonwealth waters. These are collectively referred to as the Reindeer facilities.

The Reindeer facilities are located approximately 80 km offshore, northwest of Dampier, in the Barrow Sub-basin on the Northwest Shelf Province in the North-west Marine Region. The Reindeer facilities are situated in water depths of 58 m and are comprised of the:
• Reindeer wellhead platform (WHP) - unmanned;
• 3 conventional production wells (gas/condensate) tied back to the wellhead platform (plus one temporarily abandoned well not connected to the WHP) which are remotely controlled from onshore; and,
• A single subsea and offshore gas pipeline linking the WHP to the onshore gas treatment plant.
Location map (click to enlarge)
Location map - Activity: Reindeer Wellhead Platform and Offshore Gas Supply Pipeline Operations (refer to description)

Accepted EP Documents

EP Document A738138 (24.3 MB)
OPEP Document A725184 (7.2 MB)


Back