Banner image

Activity - Reindeer Wellhead Platform and Offshore Gas Supply Pipeline Operations

Activity details
Organisation Santos WA Northwest Pty Ltd
Project Reindeer Field Development
Activity types Operation of a facility for the recovery or processing of petroleum
Operation of a petroleum pipeline
In-force EP 4917
Submission date 16 July, 2019
Outcome Accepted
Acceptance date 09 July, 2020
Locations North West
Start date 09 July, 2020
Stop date Pending titleholder notification
Lifecycle Classification Operation & Production
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Gareth Bamford
Phone: 62187100

Activity Description
The 'Santos WA Northwest Pty Ltd - Reindeer Wellhead Platform and Offshore Gas Supply Pipeline Operations' EP is a 5-year revision and comprises all activities that are associated with the operation of the Reindeer wellhead platform (WHP) and associated wells within permit area WA-41-L and the offshore section of the Devil Creek Gas Supply Pipeline (DC supply pipeline; WA-18-PL) in Commonwealth waters. These are collectively referred to as the Reindeer facilities.

The Reindeer facilities are located approximately 80 km offshore, northwest of Dampier, in the Barrow Sub-basin on the Northwest Shelf Province in the North-west Marine Region. The Reindeer facilities are situated in water depths of 58 m and are comprised of the:
• Reindeer wellhead platform (WHP) - unmanned;
• 3 conventional production wells (gas/condensate) tied back to the wellhead platform (plus one temporarily abandoned well not connected to the WHP) which are remotely controlled from onshore; and,
• A single subsea and offshore gas pipeline linking the WHP to the onshore gas treatment plant.
Location map (click to enlarge)
Location map - Activity: Reindeer Wellhead Platform and Offshore Gas Supply Pipeline Operations (refer to description)

Accepted EP Documents

EP Document A738138 (24.3 MB)
OPEP Document A725184 (7.2 MB)


Back