Activity - Otway Exploration Drilling Program

Activity details
Organisation ConocoPhillips Australia SH1 Pty Ltd
Project
Activity types Drilling
Other survey
In-force EP 7618
Submission date 09 November, 2023
Outcome Accepted
Acceptance date 28 February, 2025
Locations Otway
Start date 02 April, 2025
Stop date Pending titleholder notification
Lifecycle Classification Exploration
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Aaron Burt
Phone: +61 (0) 7 3182 7122

Activity Description
ConocoPhillips Australia SH1 Pty Ltd and ConocoPhillips Australia SH2 Pty Ltd (‘ConocoPhillips Australia’) are planning to undertake exploration activities in offshore permits VIC/P79 and T/49P located in Commonwealth waters of the Otway Basin, 20 km offshore of Victoria and 33 km offshore of King Island, Tasmania.

ConocoPhillips Australia’s proposed Otway Exploration Drilling Program involves seabed surveys at up to a maximum of nine locations, and drilling up to a maximum of six exploration wells in water depths ranging from 53 m to 200 m. The activity is scheduled to commence no earlier than 1st of December 2024 and will be completed no later than 31st of December 2028, with the exact timing dependent on the receipt of environmental approvals and the availability of a semi-submersible mobile offshore drilling unit (‘MODU’). Seabed surveys and drilling operations will be conducted 24 hours per day, 7 days per week. A 500 m radius Safe Navigation Area will be established around the seabed survey vessel/s and any towed equipment. Seabed surveys are expected to take no more than one week at each location and will be conducted by one to two vessels.

During drilling, a 500 m radius Petroleum Safety Zone and 2 km radius cautionary zone will be established around each well. Drilling will take typically 30-40 days, but no more than 90 days at each location, with the MODU supported by up to three vessels to transport equipment and provide for standby. Helicopters will support crew changes several times per week.

The following phases summarise the planned exploration program:
• Seabed surveys involving geophysical survey and geotechnical sampling.
• Move MODU to location, position, and establish mooring pattern.
• Drill conductor and surface hole sections, then case in steel pipe and cement in place.
• Install surface wellhead, blowout preventer (BOP), marine riser and test.
• Drill and construct well to total depth, with cemented casing strings.
• Run well evaluation program at each well, using Vertical Seismic Profiling (VSP) at up to two wells.
• If a hydrocarbon reservoir is discovered, Drill Stem Tests (DST) with flaring through the flare boom may be conducted at up to 4 wells.
• Conduct contingency activities such as sidetrack drilling, re-drilling sections and re-spudding.
• In parallel to well operations, conduct support operations using vessels, helicopter, ROVs, etc.
• Permanently plug and abandon the well and remove equipment from the seafloor.
• Relocate MODU to next location, or demobilise from final location.

Further information about the activity, the environmental assessment process, and the consultation process can be found at: https://conocophillipsaustralia.mysocialpinpoint.com.au/otway-exploration-drilling-program/otway-exploration-drilling-program-home
Location map (click to enlarge)
Location map - Activity: Otway Exploration Drilling Program (refer to description)

Accepted EP Documents

EP Document A1166692 (44.9 MB)
OPEP Document A1166707 (7.11 MB)
NOPSEMA Report A1185738 (241 KB)
Additional Documents A1166697 (145 MB)
Appendices A1166693 (34.4 MB)
Statement of reasons A1185756 (765 KB)

Related EP assessments

7618 (Click to view)