Activity - Bonaparte Basin Geophysical/Geotechnical Survey

Activity details
Organisation INPEX Browse E&P Pty Ltd
Project
Activity types Other survey
In-force EP 7156
Submission date 25 August, 2022
Outcome Accepted
Acceptance date 11 December, 2023
Locations Northern Territory
Start date Pending titleholder notification
Stop date 09 January, 2024
Lifecycle Classification Development
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Jake Prout
Phone: 08 6213 6000

Activity Description
INPEX Browse E&P Pty Ltd on behalf of the Bonaparte Carbon Capture and Storage Assessment Joint Operating Agreement participants was successfully awarded GHG assessment permit G-7-AP, located offshore in the Bonaparte Basin off northern Australia. The G-7-AP permit area is wholly located within Commonwealth waters to the north of the Joseph Bonaparte Gulf and approximately 100 km west of Darwin Harbour. The proposed GHG activity covered by this EP will consist of a pre-drill geophysical and geotechnical site survey. The pre-drill site survey activities are provisionally expected to be conducted in the second half of 2023. However, for contingency purposes this EP allows for the activities to occur anytime in the calendar years 2023 and 2024.

The pre-drill site survey, lasting up to approximately 30 days, will be undertaken at proposed well locations within the boundaries of the proposed project area, a small section of the broader GHG assessment permit where water depths range from approximately 75 m to 100 m.

The objective of the pre-drill site survey is to obtain a range of geophysical and geotechnical data for the proposed well locations to enable the identification of any geohazards and allow completion of the required assessments for the selection of a suitable mobile offshore drilling unit (MODU). The survey activities may be performed across an area of up to approximately 50 km2 centred on the proposed well locations and will include multibeam echo sounder, side-scan sonar, magnetometer, sub-bottom profiling, seabed grab sampling and one geotechnical borehole/or several piezo-cone penetrometer tests at each proposed well location. Operations will occur 24 hours a day.
Location map (click to enlarge)
Location map - Activity: Bonaparte Basin Geophysical/Geotechnical Survey (refer to description)

Accepted EP Documents

EP Document A1032554 (10.9 MB)
OPEP Document A1032556 (23.3 MB)

Related EP assessments

This activity has no related environment plans.