Activity - Scarborough Drilling and Completions

Activity details
Organisation Woodside Energy Scarborough Pty Ltd
Project Scarborough Project
Activity types Drilling
In-force EP 6807
Submission date 08 November, 2021
Outcome Accepted
Acceptance date 01 December, 2023
Locations Pilbara
Start date 15 September, 2024
Stop date 27 March, 2025
Lifecycle Classification Development
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Project Manager
Phone: 08 9348 4000

Activity Description
Woodside proposes to drill up to ten development wells in WA-61-L. The Petroleum Activities Program is located in Permit Area WA-61-L in Commonwealth waters, about 374 km west-northwest of Dampier, Western Australia. The closest landfall to the Petroleum Activities Program is the North West Cape, about 226 km south-south-east at its nearest point. The EP includes drilling and subsea tree installation activities for eight planned development wells and the potential for a further two additional contingency wells. Woodside may also need to intervene, workover or re-drill the wells. Subsea inspection, monitoring, maintenance and subsea infrastructure repair activities may also be undertaken. The Petroleum Activity Program will be carried out using either a DP MODU or a moored MODU, subsea installation vessel and support vessels.

The activity is planned to occur anytime within a five-year window commencing in H2 2023. Drilling and completions for the development wells is expected to take approximately 50-60 days per well to complete. Subsea inspection, monitoring, maintenance and repair activities may be conducted intermittently and over short durations in the immediate vicinity of installed subsea infrastructure. Activities will be conducted 24 hours per day, seven days per week. Timing and duration of these activities is subject to change due to project schedule requirements, drill rig and vessel availability, weather and unforeseen circumstances.
Location map (click to enlarge)
Location map - Activity: Scarborough Drilling and Completions  (refer to description)

Accepted EP Documents

EP Document A1024801 (44.1 MB)
OPEP Document A812300 (4.42 MB)
Statement of reasons A1043428 (1.22 MB)

Related EP assessments

6807 (Click to view)

Back