Activity - Geographe Subsea Installation and Commissioning

Activity details
Organisation Beach Energy (Operations) Limited
Project Otway Offshore Development (Thylacine and Geographe)
Activity types Construction and installation of a facility
In-force EP 5525
Submission date 15 February, 2021
Outcome Accepted
Acceptance date 30 July, 2021
Locations Otway
Start date Pending titleholder notification
Stop date Pending titleholder notification
Please note: activity start and stop dates are based on notifications provided by the titleholder.

Titleholder contact
Philip Wemyss
Phone: 08 8338 2833

Activity Description
Beach Energy (Operations) Limited (‘Beach’) proposes to undertake subsea installation and commissioning activities (the activity) associated with the Otway Offshore Phase 4 Development within petroleum production licence VIC/L23.

The activity area is located within the Otway Basin in Commonwealth waters, approximately 45 km southwest of the Victoria coastline at its closest point. The closest major town is Port Campbell, located approximately 54 km northeast of the north-eastern boundary of the activity area. The Apollo Australian Marine Park (AMP) is located 47 km east of the activity area. Water depth at the proposed installation location is approximately 83 m.

The scope of this EP includes the installation of tie-in spools, electrical flying leads (EFLs) and hydraulic flying leads (HFLs) to connect new production wells (Geographe-4 and Geographe-5) to the existing gathering systems. The activity will be undertaken using a construction support vessel (CSV).
The activities assessed under this EP include:
• Removal and recovery of the Geographe-3 rigid spool;
• Installation of two rigid spools between the existing manifold and the new Geographe-4 and Geographe-5 production wells;
• Installation of seven EFLs and two HFLs, including on-bottom stabilisation; and
• Commissioning program, including production spool leak testing and electrical and hydraulic function testing.

The proposed activity will be undertaken over a period of up to 30 days in the four-month window of the start of August 2021 to the end of October 2021 (with a contingency for November in case of project delays), with the exact timing for commencement and completion being dependent upon vessel availability, granting of EP approval and sea state conditions.
Location map (click to enlarge)
Location map - Activity: Geographe Subsea Installation and Commissioning  (refer to description)

Accepted EP Documents

EP Document A791203 (23 MB)
Appendices A791200 (16.9 MB)

Related EP assessments

5525 (Click to view)

Back